Colorado and the Mountain West

A shorter path from application to energization.

Connection Cycle Group fixes the order-to-energization process for electric cooperatives and municipal utilities. The aim is a new-service connection measured in weeks, with the hours that process consumes returned to the people who already run it.

Engagements are fixed in scope, delivered remotely, and taken one at a time. Lower cost follows a shorter cycle. It is the payoff, after speed and after the hours returned.

Prefer a quick call? Reply and we'll find 15 minutes.

The Diagnostic is $3,500 and takes one week. The card link collects the $1,750 deposit, half the fee, and reserves the next open start week. The balance is due when the report is delivered.

What the work returns

Speed first. Hours next. Cost as the result.

  • Faster connections

    The point of the work is a shorter path from the application to the day the meter is set, so a new member is energized while the request is still current.

  • Hours returned to staff

    A stalled order is opened again by member services, engineering, and the line crew. Clearing the stall returns those hours to work that is already scheduled.

  • Lower cost, as the payoff

    Fewer open weeks and fewer repeated handoffs reduce what a connection costs the utility. The savings follow the shorter cycle.

The cycle

Eight handoffs, from the application to the first bill.

Delay usually sits between desks. We map the path an order actually takes, through every stage a new service has to clear.

  1. 01Application
  2. 02Credit and deposit
  3. 03Staking and engineering
  4. 04Easements
  5. 05Permits and fees
  6. 06Construction
  7. 07Meter set
  8. 08Billing

Services and fees

The fees are published in full.

No hourly discovery, no retainer, and no subscription. A general manager can take the number to a board without a sales meeting. If the contract has to be approved, we will write it as a fixed fee or a not-to-exceed amount.

Connection Cycle Diagnostic

$3,500

One week. Fixed finish.

Measures where days are lost at each stage, using a recent sample of your orders. You get real numbers, a ranked list of where orders stall, and the top fixes.

Deposit of $1,750 to reserve the start week. Balance of $1,750 when the report is delivered.

Full Connection Cycle Audit

$7,500

Two weeks. Fixed finish.

Adds a full cycle-time baseline, root causes for the main order types in your sample (for example new homes, commercial, solar/interconnection), and a sequenced 90-day fix roadmap with an owner for each step.

The Diagnostic fee is credited in full if the Audit is signed within 60 days. Deposit of $3,750. Balance when the report is delivered.

Fixed fee or not-to-exceed
For a contract a board has to approve, we will state one or the other. The scope in the sample summary is the scope we contract.
One client at a time
A deposit holds the next open start week. We confirm that week by email before work begins.
Half to begin
Fifty percent reserves the week. The balance is due when the report is delivered. There is no retainer after that.

Start with the backlog, not a contract.

Prefer a quick call? Reply and we'll find 15 minutes.

How an engagement runs

Three steps, and about two to three hours of staff time.

The work is remote and asynchronous. There is no on-site workshop. Most of the hours are ours. The one- or two-week clock starts when we receive your order data.

  1. 01

    Book

    Email us about the backlog, or reserve the next open week with a deposit. We confirm the week by email before anything else.

  2. 02

    Share the record

    We send a short request: the path an application follows today, a sample of recent new-service orders, and the names of the people who touch them. You send what you already keep. Staff time across the engagement is about two to three hours.

  3. 03

    Read the findings

    You receive a written report and a readout. The Diagnostic measures where days are lost at each stage and ranks where orders stall. The Audit adds a full cycle-time baseline, root causes for the main order types in your sample (for example new homes, commercial, solar/interconnection), and a sequenced 90-day fix roadmap with an owner for each step.

Procurement kit

What a general manager can forward.

The offer sheet, the sample scope, and a sample findings page are written so a general manager can see the work before taking it to a board.

Illustrative example with mock data. Not client data.

Example Electric Cooperative

Median days in each stage. The longest bar is the bottleneck.

  • Application received/complete 4
  • Design & staking 7
  • Easements/ROW 20
  • Member/customer payment (CIAC) 5
  • Work order release & scheduling 6
  • Construction 8
  • Inspection & meter set 4
  • Energized/closed 2

Easements/ROW: 20 median days, 40% of controllable delay (20 of 50 days).

  • Offer sheet

    One page. Fees, what is included, and how to buy. Suitable to forward as it stands.

    Download the offer sheet (PDF)
  • Sample scope summary

    The scope we contract: stages reviewed, method, staff time, deliverables, and what the engagement does not include.

    Download the scope summary (PDF)
  • Sample findings page

    One page. A fictional cooperative, the chart above, the top bottleneck, and two sample recommendations. Illustrative example with mock data. Not client data.

    Download the sample findings (PDF)

About

The person who scopes the work writes the report.

Connection Cycle Group advises electric cooperatives and municipal utilities on the order-to-energization process. The practice is based in Colorado and works remotely with utilities in the Mountain West.

Nate Shull

Nate Shull leads every engagement. He leads a service activation operations team, where the responsibility is getting a requested service from the order to the day it goes live, and finding the handoffs where the days accumulate.

The firm stays small so that the person a general manager speaks with is the person who reads the orders. We take one client at a time.

Questions

Before the engagement is signed.

What do you need from us?

A description of the current path, in whatever form you have it. A sample of recent new-service orders with the dates you can reconstruct, from the application through energization and the first bill. The names of the people who handle each stage. Any standard deposit, fee, or board policy that governs new service.

Partial records are usable. We do not need a new system, a warehouse export, or a cleaned-up process map.

How much staff time does this take?

About two to three hours in total, for either engagement. That is a kickoff call plus up to three short (30-minute) staff calls, and the time to pull the documents. The rest of the hours are ours, and they are asynchronous. We schedule the calls around your operations.

Will our information stay confidential?

Yes. Operating data, member information, and board materials are confidential. We will sign your nondisclosure agreement before any files are sent. We do not publish a client’s name, and we do not describe a client’s system to anyone else, without written permission.

What is the difference between the Diagnostic and the Audit?

The Diagnostic is $3,500 and takes one week. It measures where days are lost at each stage, using a recent sample of your orders. You get real numbers, a ranked list of where orders stall, and the top fixes.

The Full Audit is $7,500 and takes two weeks. It adds a full cycle-time baseline, root causes for the main order types in your sample (for example new homes, commercial, solar/interconnection), and a sequenced 90-day fix roadmap with an owner for each step. The Diagnostic fee is credited in full if the Audit is signed within 60 days.

What if the process is already in good order?

You still receive a written findings report. If orders are not stalling, the report says so, and it says where the time goes. This is advisory work. We do not guarantee a reduction in cycle time or in cost. We will give you a clear account of what we found, ranked, and explained in a readout.

How does payment work?

Half the fee is due as a deposit. The deposit reserves the next open start week. The balance is due when the report is delivered. The card link collects the Diagnostic deposit of $1,750. The Audit is invoiced: a deposit of $3,750, then the balance on delivery. For a contract that requires board approval, we will state a fixed fee or a not-to-exceed amount.

The Diagnostic fee of $3,500 is credited in full against the Audit if the Audit is signed within 60 days of the Diagnostic.

Book

Reserve the next open week.

We take one engagement at a time. The deposit holds the next open start week, which we name in the confirmation email. We sign your nondisclosure agreement before any files are sent.

  1. We confirm the start week by email.
  2. We send the data request. Your staff time from there is about two to three hours.
  3. You receive the written report and the readout within the term of the engagement.

Diagnostic deposit by card

The Diagnostic is $3,500 and takes one week. It measures where days are lost at each stage, using a recent sample of your orders. Card checkout collects the $1,750 deposit. The balance is invoiced when the report is delivered. The Full Audit is $7,500 and takes two weeks. It adds the cycle-time baseline, root causes for the main order types in your sample (for example new homes, commercial, solar/interconnection), and the 90-day roadmap. To schedule the Audit, use the invoice form. Card checkout is completed on Stripe. We never see the card number.

Pay $1,750 deposit by card

Pay by invoice or purchase order

For cooperatives and public utilities that pay on account. We reply by email with the invoice. Half the fee is the deposit. The balance is due when the report is delivered.

Fields marked with * are required.

Optional. A direct number, if you want one on the invoice.
e.g., the week of January 11
Will a purchase order be required?
A billing address, if you have it.